Avtostrada constructs the supports and retaining walls of the Darnytskyi Bridge left-bank junction

image

Specialists of the Avtostrada's bridge construction division continue construction of the left-bank junction of the Darnytskyi Bridge in Kyiv 24/7. The project envisages the construction of two exits to the Dnipro embankment (towards Bazhan Avenue and towards Paton Bridge) and an entrance to the bridge (from Bazhan Avenue).

We are currently working on all the main congress buildings at the same time, including the construction of retaining walls. Concrete works, production of metal constructions, bored piles are being arranged.

Thus, in particular, 18 blocks of retaining wall, each weighing 14-15 tons, have already been installed on the building №8L, which leads in the direction of Bazhan Avenue and its length will be 140 meters. To perform these works, a truck crane with a capacity of 100 tons is used. We are concreting the 9th grid of the retaining wall, and arranging sheet piling along the embankment.

Works on the installation of bored piles, concreting of grilles and installation and monolithization of cabinet wall blocks is underway at the №9L building.

On the structures №3L and №4L we arrange grilles, support bodies, crossbars, as well as bored piles with a diameter of 1.5 m.

Two modern powerful drilling rigs - Bauer BG 45 and Bauer BG 36 - are used for the installation of bored piles at the site.

110 specialists of the bridge-building division of Avtostrada work on Darnytskyi Bridge, more than 50 units of specialized equipment are involved.